Publications

Detailed Information

Development of cultivation schema and automated gully convey-spacing system for multilayer plant factory

Cited 0 time in Web of Science Cited 0 time in Scopus
Authors

Alireza Ashtiani Araghi

Advisor
Rhee Joong Yong
Major
농업생명과학대학 바이오시스템·소재학부
Issue Date
2015-02
Publisher
서울대학교 대학원
Keywords
automationhydroponic gullymultilayer growing unitprogrammable logic controllersimulation modulestatic and dynamic cultivation
Description
학위논문 (박사)-- 서울대학교 대학원 : 바이오시스템·소재학부, 2015. 2. 이중용.
Abstract
Cultivation of leafy vegetables with hydroponic gullies in multilayer plant factories is one of the initiatives used to increase the plant production in artificially controlled indoor environments. Multistage mobile or dynamic cultivation with variable row spacing between gullies, used in single-layer cultivation, is another option to increase the average crop density and more efficient utilization of available area. Employment of dynamic cultivation in multilayer growing units can further increase the plant production rate, if an appropriate cultivation plan is adopted and executed during the process. To this end, developing a model for i) evaluating the performance of multilayer dynamic cultivation plans and comparing their performances with alternative static option, and ii) finding the details of the procedure used for executing the evaluated cultivation plan is a major objective in the first part of this study. Indices such as plant production rate, turning point day, and total number of produced plants during a certain period of time were defined and used to measure the performance of cultivation plans. Using the Labview programming, the model is then converted into a simulation module with visual input-output panel which represents a cultivation schema after the end of each simulation. In this way, a cultivation schema includes the characteristics and performance of a cultivation plan as well as the procedure to execute it. The visual panel was used to obtain the cultivation schemas of all dynamic and static cultivation plans applicable for continuous crop production in total eight cultivation layers during a maximum 180-day period. Various input conditions such as dissimilar clustering conditions, zigzag and square planting arrangements, and two crop types (Romaine and Korean lettuce cultivars) with different canopy growth behaviors were used in different simulations. A combinational cultivation plan including a dynamic plan with 1-2-3 clustering optimized with one static-dynamic hybrid layer, and two independent static layers was selected as the best cultivation plan with highest plant production for zigzag planting of Romaine lettuce. The increase in total plant production by this plan was found to be 7.5% (232 lettuce heads) higher than the alternative static plan, although the last crop output of this plan was supplied 10 days later than the static option. The best plan for cultivation of Korean lettuce in total eight cultivation layers was a dynamic plan with 3-5 clustering with one optimized hybrid static-dynamic layer. Comparing to static plan, the increase in total plant production by this plan was about 19% (512 lettuce heads) in 168 days. These results indicated that employment of multilayer dynamic cultivation for increasing the plant production is less beneficial for the crops with lower growth rate of canopy diameter, e.g., Romaine lettuce, while opposite of this is true about the crops with faster horizontal growth, e.g., Korean lettuce. Results of simulations revealed that the dynamic plans with inappropriate clustering conditions, excessive row spacing, and improper timing of growth stages would cause inefficiency in the utilization of crop growing area and has no preference over the less cumbersome and cheaper to implement static option. It was also found that multilayer dynamic cultivation is not an advantageous option for increasing the total plant production in short term (1-2 months) cultivation periods. Moreover, adopting a greater number of growth stages in executing a dynamic cultivation plan was not the determinant factor for enhancing the amount of plant production.
The purpose of the second part of this study is to design and develop an automated system with reduced manufacturing costs and new technical features for gully handling operation e.g., row spacing operation and controlled gully conveying, based on the procedure of executing the plans given by the cultivation schema. Obtaining a flexible and precise automated row spacing operation in different cultivation layers of the growing unit and providing bi-directional controlled conveying of gullies in vertical direction are the key objectives in this design. The developed automated gully convey-spacing system consists of three sub-systems including, i) a couple of 4-layer growing units equipped with gully load/unloading mechanisms, ii) an autonomous vehicle, and iii) the gully supplier. Different types of actuators, sensors, and a PLC extended with special modules as the controller unit of the system were employed. Since adjustment of row spacing values between the gullies in cultivation layers is the most critical functional objective of the automated system, the automated scheme of this operation was examined before using in the real operation through motion analysis of system virtual prototype by CAE simulation. No deviation from determined target row spacing values was observed at the end of simulations and thus, results of the motion analysis confirmed the effectiveness of the schemes proposed for row spacing operation in all defined spacing modes. Moreover, results of the experiments conducted to evaluate the ability of system in executing automated row spacing operation indicated that the average error in positioning of the gullies was 5.4, 5 and 8.5 % in spacing modes 1, 2, and 3, respectively. Experiments for testing the system functionality and the control schemes developed for other automated operations of the system such as layer targeting, manipulators locking, and displacement of gullies between different cultivation layers were also conducted with successful results. Using the output data obtained from the simulation module-cultivation schema in part one, a case study was also carried out to analyze and estimate the performance and operation time of the system during an integrated automated operation for executing the optimal cultivation plan of the Korean lettuce in total eight cultivation layers. Results of time analysis of system operation in different working days showed that an estimated time of 9 hours of automated operation is required for handling 220 gullies in eight cultivation layers. This operation time can be considerably reduced if faster linear actuators with higher duty cycles, and higher speeds of vertical gully conveying are used in the current developed system. Lower initial costs and easier control of the system due to less number of motors and actuators for running the automated operation in all growing units caused by centralization of all power sources in a single autonomous vehicle, and the ability to create a wide range of accurate row spacing values at any cultivation layer of the growing unit, simply through tuning of related parameters in the control program are some of new features of the developed automated system.
Language
English
URI
https://hdl.handle.net/10371/121113
Files in This Item:
Appears in Collections:

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share