Model-based dynamic resource management for construction projects

Cited 37 time in Web of Science Cited 43 time in Scopus
Authors
Park, Moon-Seo
Issue Date
2005-04-07
Publisher
Elsevier
Citation
Automation in Construction, vol. 14 (5), 2005, pp.585-598
Keywords
Resource managementSimulationFeedbackResource coverageSystem dynamics
Abstract
Excess resource idling can result in cost overruns, while low resource coverage or long lead-time in resource acquisition can delay the project schedule. Therefore, systematically managing this tradeoff is critical to ensure project delivery in time and within budget. In addition, to provide practically useful guidelines and tools, the dynamic construction process needs to be realistically represented. As an effort to address these issues, a model-based dynamic approach is proposed for construction resource management. The dynamics of construction progress and the tradeoff with resource coverage are identified. Then, the dynamic resource management model that has been developed using system dynamics is described. By simulating the model with heuristic and industry data, the effect of resource coverage on project performance is quantified and policy implications are obtained for dynamic resource management. Finally, the use of the model as an automated tool is demonstrated.
ISSN
0926-5805
Language
English
URI
http://hdl.handle.net/10371/18607
DOI
https://doi.org/10.1016/j.autcon.2004.11.001
Files in This Item:
There are no files associated with this item.
Appears in Collections:
College of Engineering/Engineering Practice School (공과대학/대학원)Dept. of Architecture and Architectural Engineering (건축학과)Journal Papers (저널논문_건축학과)
  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Browse