Publications
Detailed Information
다단계 작업 구조를 고려한 유연 잡샵 일정 계획 : Flexible job shop scheduling with multi-level job structures
Cited 0 time in
Web of Science
Cited 0 time in Scopus
- Authors
- Advisor
- 박진우
- Issue Date
- 2002
- Publisher
- 서울대학교 대학원
- Keywords
- 일정계획 ; scheduling ; 유연 잡샵 ; flexible job shop ; 다단계 작업 구조 ; multi-level job structure ; 유전 알고리즘 ; genetic algorithm ; 대규모 단계 최적화 ; large step optimization
- Description
- 학위논문(박사)--서울대학교 대학원 :산업공학과,2002.
- Language
- Korean
- URI
- http://dcollection.snu.ac.kr:80/jsp/common/DcLoOrgPer.jsp?sItemId=000000062953
https://hdl.handle.net/10371/34719
- Files in This Item:
- There are no files associated with this item.
Item View & Download Count
Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.