Publications

Detailed Information

Optimal option selection for finishing works of high-rise building

DC Field Value Language
dc.contributor.authorLee, Hyun-Soo-
dc.contributor.authorRoh, San-
dc.contributor.authorPark, Moon-Seo-
dc.contributor.authorRyu, Han-Guk-
dc.date.accessioned2013-01-22T06:56:26Z-
dc.date.available2013-01-22T06:56:26Z-
dc.date.issued2010-09-
dc.identifier.citationKSCE JOURNAL OF CIVIL ENGINEERING, Vol.14, No.5, pp.639-651ko_KR
dc.identifier.issn1226-7988-
dc.identifier.urihttps://hdl.handle.net/10371/80977-
dc.description.abstractTime-Cost Trade-Off Problem (TCTP), to determine optimal option among many options of construction work of high-rise building, is an issue that needs to be addressed to optimize construction duration with minimal cost. Despite the fact that the crashing process entailed in a network scheduling method is not suitable for the repetitive activities of a construction project, traditional time-cost trade-off focuses on the techniques for minimizing construction cost and time in a network-based scheduling method. In addition, time-cost relationships are usually presumed to be linear, not nonlinear. Since only integer durations (days) are considered in construction scheduling, linear approximation is not fully suitable to solve the TCTP. Thus, time-cost relationships need to be redefined at discrete points representing time-cost options. In addition, Tact scheduling is one of the most useful scheduling methods to reflect the repetitiveness usually demonstrated in a LOB (Line of Balance) form. However, Tact scheduling requires too much time and effort to determine Tact time, options (cost and time of activity), and the group of activities with the same option. Genetic Algorithms (GAs) are efficient in searching for optimal solutions among decision alternatives. Thus, the authors propose a time-cost trade-off method of Tact scheduling that uses GAs.ko_KR
dc.description.sponsorshipThis research was supported by a grant (05CIT-D05-01) from Construction Technology Innovation Program funded by Ministry of Land, Transport and Maritime Affairs of Korean government.ko_KR
dc.language.isoenko_KR
dc.publisherSpringer Verlagko_KR
dc.subjectscheduleko_KR
dc.subjecttactko_KR
dc.subjecttime-cost trade-offko_KR
dc.subjectgenetic algorithmsko_KR
dc.subjectoptimizationko_KR
dc.subjecthigh-rise buildingko_KR
dc.titleOptimal option selection for finishing works of high-rise buildingko_KR
dc.typeArticleko_KR
dc.contributor.AlternativeAuthor이현수-
dc.contributor.AlternativeAuthor노산-
dc.contributor.AlternativeAuthor박문서-
dc.contributor.AlternativeAuthor류한국-
dc.identifier.doi10.1007/s12205-010-0904-z-
dc.citation.journaltitleKSCE JOURNAL OF CIVIL ENGINEERING-
dc.description.tc0-
Appears in Collections:
Files in This Item:
There are no files associated with this item.

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share