한국의 민간투자사업에 대한 비판적 고찰 : Analytical observation of public-private partnerships in Korea
Cited 0 time in
Web of Science
Cited 0 time in Scopus
- Authors
- Advisor
- 정광호
- Major
- 행정대학원 정책학과
- Issue Date
- 2019-02
- Publisher
- 서울대학교 대학원
- Description
- 학위논문 (박사)-- 서울대학교 대학원 : 행정대학원 정책학과, 2019. 2. 정광호.
- Abstract
- Public-Private Partnerships(PPP) in Korea brought about investment
worth KRW104 trillion, making significant progress. However, it has
been under severe criticism that it sucks up tax payers money.
With that regard, I sought to discuss the prospect of PPPs. My
discussion relates to Minimum Revenue Guarantee(MRG) with focus
on the timeline of implementation, transition process, international
comparison, implication for the rate of return and comparison between
private and public financing.
As for the major milestones of PPPs, the permission of unsolicited
projects in 2016 and PPPs extended to social service industry have
been highlighted. MRG has been carried out as stipulated in separate- 134 -
laws, such as Harbor Act and Toll Road Act.
Speaking of the transition process of MRG, separate laws define that
the period of free use can be scaled up or down rather than
curtailing only. The difference between guaranteed profits and cost
recovery comes from lower applicable interest rates and lower level
of guarantees on demand, not the guarantee mechanism. Therefore,
any potential increase in treasury bond interest rates must be taken
into account. Furthermore, as observed from Busan New Port
Development project, the operating entity joining the consortium as an
investor could lead to positive results- the abolishment of MRG by
the proposal of private partner.
According to international comparisons of PPPs, Korea follows the
continental law legal system, a collection of written rules while the
announcement of basic plan for PPPs acts like government guidelines
applying the principles of the common law. Meanwhile, the allocation
of demand risk was referred to the classification of European
Investment Bank(EIB).
MRG in Korea has similarities with those of Chile and Turkey in
terms of defining the provision of guarantees and redemption.
Differences are found in that MRG was initiated by the extension of
period of free use under separate laws in Korea and revised as a
readjusted financing method in case of refinancing and project
restructuring. Its dynamism differentiates MRG in Korea from others.
MRG has implications for the rate of return and attraction of the
private funds. MRG provision was initially expected to help ease
uncertainties surrounding PPPs and therefore, set the rate of return at
a lower level. However, it turned out that MRG and the rate of- 135 -
return are positively correlated.
PPP projects with MRG provision had a greater relation on the size
of the total project cost. The number of concession agreements
signed was higher before MRG was abolished at an annual average
of 12.2 compared with an annual average of 5.1 after its abolishment.
The correlation between MRG provision and the rate of return seems
to be caused by political purposes to boost the economy and attract
the private fund since the IMF, insufficient experience as well as
information asymmetry among others. According to the ex-post
analysis of value for money(VFM) for Cheonan-Nonsan Expressway,
a lower level of MRG and fall in prices improve vfm while falls in
discount rate and treasury bond interest rate compromised vfm. Even
though additional variables, such as the total project cost, operating
profits, operating cost, construction period, the period of free use and
the rate of return are included in the analysis, no specific method
stood out as notably excellent. However, such analysis provides
valuable lessons as follows.
First, better understanding of MRG and PPPs are required.
Furthermore, demand analysis has to be done accurately to enhance
efficiency in project implementation as PPP projects under separate
laws or by public corporation also lead to demand risk distribution.
Second, any upward trend in interest rates must be at guard. The
PPP operator has to be encouraged to participate in the project as an
investor and competition has to be invited to PPPs. Third, for further
progress in PPPs, demand risk distribution has to be met with policy
adjustment, such as reducing the rate of return. Forth, many
variables have to be examined before selecting which implementation
method is better than others. Empirical evidence must be carefully- 136 -
studied. I hope more empirical literature accumulates overseas and
Koreas PPPs applies across the globe. Additionally, valuable data
accumulated by operating PPP projects must be thoroughly analyzed
to inform upcoming PPP projects for better outcomes.
국문초록
민간투자사업은 104조원의 투자가 이루어지는 등 성과를 거두고 있지만
혈세 먹는 하마로 표현되는 등 비판도 많다. 특히 논쟁의 대상이 되어
왔던 최소운영수입보장제도와 관련하여 도입시기와 변천과정, 국제비교,
실시협약상 수익률과의 관계, 민자사업 추진과 재정사업 추진의 비교 사
례 등 다양한 고찰을 통하여 향후 방향을 알아보고자 하였다.
우선, 민간투자제도의 변천과정은 2016년 민간제안 허용 반영과 사회
서비스 사업으로의 확대를 주목할 필요가 있으며, 최소운영수입보장제도
는 항만법, 유료도로법 등 개별 법률 규정을 통해 도입 및 운영되어 왔
음을 살펴보았다. 최소운영수입보장제도 변천 특징을 알아보면, 개별법의
경우에는 무상사용기간의 변화가 축소 위주가 아니라 축소와 확대가 섞
여 있다는 점, 수입에 대한 보장과 민간 비용에 대한 보장의 차이는 보
장 방식보다 적용된 이자율이 낮고 수요 보장의 수준도 적다는 점에 기
인하므로 국고채 이자률 상승에도 대비가 필요한 점, 부산 신항만의 경
우처럼 민간사업자의 제안에 따라 MRG가 폐지된 경우가 특이한 바 운
영사를 출자자로 참여시키는 것이 좋은 결과를 가져온다는 점 등을 알
수 있다.
민간투자제도를 국제 비교해 보면 우리나라는 성문법인 대륙법적 체계
를 따르지만 민간투자기본계획 공포를 통해 영미법의 정부가이드라인 성
격도 가지며, 수요 위험에 대한 배분 측면에서는 유럽투자은행 분류에
따른 다양한 제도를 시행하여 왔다고 할 수 있다. 최소운영수입보장제도
는 칠레와 터키처럼 보장과 환수를 동시에 규정하는 방식으로 유사한 점
이 있으나, 개별법에서 무상사용기간 연장을 통하여 시작되었고, 자금재
조달․사업재구조화의 금융조달 재조정방식으로 수정되는 등 역동성을
가진 점에서 차별성을 가진다고 할 수 있다.
MRG 제도와 실시협약 투자수익률과 민간재원 투자유인 효과간의 관
계를 보면, MRG 보장 여부는 불확실성을 완화시킴으로써 수익률이 낮
게 설정될 것이라는 기대와 달리 민간투자사업의 수익률에 양의 상관관계
를 나타내었다. 또한 총사업비 규모에는 MRG 보장 민간투자사업이 더욱- ii -
크게 반응하였고, MRG 존속기간 중 민간투자사업 제안 사업의 실시협약
체결 건수(연평균 12.2건)가 폐지된 이후 건수(연평균 5.1건)보다 높았다.
MRG 보장 여부가 수익률과 양의 관계를 보이는 것은 IMF 이후 민간자
본 유치와 경기활성화를 위한 정책적 목적과 경험 부족 및 정보의 비대
칭성 등에 주로 기인한 것으로 보인다.
재정과 민자사업간 추진 방식 비교를 위한 기존 천안논산고속도로 사
후 VFM 분석은 MRG 수준의 하향과 물가하락은 VFM을 개선하지만
할인율과 국고채 금리 하락은 VFM을 나빠지게 하는 것으로 보인다. 분
석 변수에 총사업비, 운영수입, 운영비용, 건설기간, 무상운영기간, 수익
률를 추가하여 보았는 바 특정방식의 우월성을 확인할 수 없었다.
이러한 분석을 통하여 다음과 같은 교훈을 얻을 수 있다. 첫째, MRG
및 민간투자제도와 대한 이해를 폭 넓게 하여야 하며 개별법에 의한 민
간투자사업과 공기업에 의한 사업도 실질적으로 수요 위험 분담이 되고
있기 때문에 수요 검증을 통하여 사업 추진의 효율성을 높일 필요가 있
다. 둘째, 이자율 상승기에 대한 대비가 필요하고 운영사의 출자 참여 유
도와 사업 경쟁 구도가 요망된다, 셋째, 민간투자사업의 향후 발전을 위
해 MRG 등 수요 위험 분담이 이루어진 경우에는 당해 사업의 수익률을
낮추는 등의 정책 지원 조정이 필요한 것으로 보인다. 넷째, 사업추진 방
식에 대한 판단은 추진 당시 여러 변수들의 상황을 보고 판단하여야 하
며 선험적으로 어느 방식이 다른 방식으로 우월하다고 할 수는 없고 실
사구시의 자세가 현실적이다.
향후 해외 실증 연구들이 더 많이 축적되어 우리나라 민간투자사업의
해외진출에 도움이 되기를 바라고 그 동안의 민간투자사업 관련 데이터
들이 누적되고 체계적으로 연구되어 민간투자사업의 의사결정에 실질적
인 도움이 되기를 기대한다.
주요어 : 최소운영수입보장제도(Minimum Revenue Guarantee, MRG),
변천과정, 도입시기, 국제비교, 수익률과 투자유인 영향, 재
정사업과 민자사업 사례 비교.
학 번 : 2010-30692
- Language
- kor
- Files in This Item:
Item View & Download Count
Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.