유전자알고리즘을 이용한 공기-비용 절충방안 - 초고층 마감공사를 중심으로 : Scheduling Method by Using Genetic Algorithms to Solve Time-Cost Trade-Off Problems - Focused on High-rise Building Finishing Work

DC Field Value Language
dc.contributor.author노산-
dc.contributor.author이현수-
dc.contributor.author박문서-
dc.contributor.author류한국-
dc.date.accessioned2009-12-04T06:45:51Z-
dc.date.available2009-12-04T06:45:51Z-
dc.date.issued2006-
dc.identifier.citation대한건축학회논문집 구조계, 22(6), pp.157-164en
dc.identifier.issn1226-9107-
dc.identifier.urihttp://uci.or.kr/G300-j12269107.v22n6p157-
dc.identifier.urihttps://hdl.handle.net/10371/18674-
dc.description.abstractAs buildings are high-rised, diversified, complex and large-sized, it is necessary to develop a more efficient algorithm for good and optimal solutions for construction project. High-rise building is composed of repetitive activities. Tact, one of the well structured management system for the repetition is proposed to manage scheduling technique in this paper and a process is suggested to solve Time-Cost Trade-Off Problem(TCTP). Time-Cost Trade-Off is a scheduling method to shorten the duration within a minimum added cost. Traditional Time-Cost Trade-Off analysis assumes that time and cost of an option for an activity are deterministic and focus on the techniques to minimize construction cost and time. However, method for generating the options is not studied to solve the TCTP in the previous studies. Therefore, the objective of this study is to help construction manager make a decision by proposing the option generating method and the relationship of time and cost according to these options using genetic algorithm for high-rise building finishing work.en
dc.description.sponsorship본 논문은 초고층 건축물 건설기술개발(03산C04-01) 연구결과의 일부이며 건설교통부가 출연하고 한국건설교통기술평가원에서 위탁시행한 2005년도 건설기술기반구축사업(과제번호: 05 기반구축 D05-01)의 지원으로 이루어졌습니다.en
dc.language.isokoen
dc.publisher대한건축학회 = Architectural Institute of Koreaen
dc.subject옵션en
dc.subject초고층 건축물en
dc.subject마감작업en
dc.subject공기-비용 절충en
dc.subject유전자 알고리즘en
dc.subject택트en
dc.subjectOptionen
dc.subjectHigh-rise Buildingen
dc.subjectFinishing Worken
dc.subjectTime-Cost Trade-Offen
dc.subjectGenetic Algorithmsen
dc.subjectTacten
dc.title유전자알고리즘을 이용한 공기-비용 절충방안 - 초고층 마감공사를 중심으로en
dc.title.alternativeScheduling Method by Using Genetic Algorithms to Solve Time-Cost Trade-Off Problems - Focused on High-rise Building Finishing Worken
dc.typeArticleen
dc.contributor.AlternativeAuthorRoh, San-
dc.contributor.AlternativeAuthorLee, Hyun-Soo-
dc.contributor.AlternativeAuthorPark, Moon-Seo-
dc.contributor.AlternativeAuthorRyu, Han-Guk-