Publications
Detailed Information
Evaluation of Acceleration Effect of Dynamic Sequencing of Design Process in a Multiproject Environment
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Kang, Changmuk | - |
dc.contributor.author | Hong, Yoo S. | - |
dc.date.accessioned | 2012-03-05T02:32:20Z | - |
dc.date.available | 2012-03-05T02:32:20Z | - |
dc.date.issued | 2009-02 | - |
dc.identifier.citation | JOURNAL OF MECHANICAL DESIGN; Vol.131 2; - | - |
dc.identifier.issn | 1050-0472 | - |
dc.identifier.uri | https://hdl.handle.net/10371/75363 | - |
dc.description.abstract | The design process is difficult to accelerate due to its iterative nature, which increases project cost and delays completion time of a design project. Many previous studies tried to find the optimal structure and sequence of a design process minimizing iteration. In a multiproject environment, however, waiting time caused by resource shortage is a more critical reason for a lengthy project than iteration time. In this paper, we propose a novel sequencing method that reduces waiting time in a multiproject environment by dynamically changing the sequence of design tasks, according to availability of resources. It is called a dynamic sequencing method, as opposed to the traditional static sequencing method by which every design project follows a predefined optimal sequence. In order to evaluate the effect of this method, we developed a design-process model for simulating iteration and waiting in a multiproject environment. The simulation results show that dynamic sequencing is significantly better than traditional static sequencing with respect to average duration of projects. It is noted that more significant improvements can be obtained for the bottlenecked and unbalanced processes, both of which conditions would otherwise have negative effects on process performance. | - |
dc.language.iso | en | - |
dc.publisher | ASME-AMER SOC MECHANICAL ENG | - |
dc.subject | design engineering | - |
dc.subject | project management | - |
dc.subject | iterative methods | - |
dc.subject | minimisation | - |
dc.title | Evaluation of Acceleration Effect of Dynamic Sequencing of Design Process in a Multiproject Environment | - |
dc.type | Article | - |
dc.contributor.AlternativeAuthor | 강창묵 | - |
dc.identifier.doi | 10.1115/1.3066599 | - |
dc.citation.journaltitle | JOURNAL OF MECHANICAL DESIGN | - |
dc.description.citedreference | Holtta-Otto K, 2007, CONCURRENT ENG-RES A, V15, P113, DOI 10.1177/1063293X07078931 | - |
dc.description.citedreference | Meier C, 2007, J MECH DESIGN, V129, P566, DOI 10.1115/1.2717224 | - |
dc.description.citedreference | Abdelsalam HME, 2007, J MECH DESIGN, V129, P150, DOI 10.1115/1.2216730 | - |
dc.description.citedreference | Cho SH, 2005, IEEE T ENG MANAGE, V52, P316, DOI 10.1109/TEM.2005.850722 | - |
dc.description.citedreference | Cohen I, 2005, ANN OPER RES, V134, P183, DOI 10.1007/s10479-005-5730-1 | - |
dc.description.citedreference | Roemer TA, 2004, OPER RES, V52, P606, DOI 10.1287/opre.1040.0125 | - |
dc.description.citedreference | COHEN I, 2004, PROJECT MANAGE J, V35, P39 | - |
dc.description.citedreference | ULRICH KT, 2003, PRODUCT DESIGN DEV | - |
dc.description.citedreference | ELONEN S, 2003, INT J PROJ MANAG, V21, P395, DOI 10.1016/S0263-7863(02)00097-2 | - |
dc.description.citedreference | ANAVIISAKOW S, 2003, INT J PROJECT MANAGE, V21, P9 | - |
dc.description.citedreference | Browning TR, 2002, IEEE T ENG MANAGE, V49, P428, DOI 10.1109/TEM.2002.806709 | - |
dc.description.citedreference | Ahmadi R, 2001, EUR J OPER RES, V130, P539 | - |
dc.description.citedreference | YASSINE AA, 2001, ANAL MULTIPLE PRODUC | - |
dc.description.citedreference | Roemer TA, 2000, OPER RES, V48, P858 | - |
dc.description.citedreference | Narahari Y, 1999, IEEE T ROBOTIC AUTOM, V15, P882, DOI 10.1109/70.795793 | - |
dc.description.citedreference | Ahmadi R, 1999, OPER RES, V47, P235 | - |
dc.description.citedreference | ANDERSSON J, 1998, P ASME INT DES ENG T | - |
dc.description.citedreference | Smith RP, 1997, MANAGE SCI, V43, P1104 | - |
dc.description.citedreference | Krishnan V, 1997, MANAGE SCI, V43, P437 | - |
dc.description.citedreference | Smith RP, 1997, MANAGE SCI, V43, P276 | - |
dc.description.citedreference | Altus SS, 1996, J MECH DESIGN, V118, P486 | - |
dc.description.citedreference | ROGERS JL, 1996, 110247 NASA | - |
dc.description.citedreference | ADLER PS, 1995, MANAGE SCI, V41, P458 | - |
dc.description.citedreference | MURTY KG, 1995, OPERATIONS RES DETER | - |
dc.description.citedreference | EPPINGER SD, 1994, RES ENG DES, V6, P1 | - |
dc.description.citedreference | SMITH RP, 1993, P INT C ENG DES ICED, P564 | - |
dc.description.citedreference | WHEELWRIGHT SC, 1992, HARVARD BUS REV, V70, P70 | - |
dc.description.citedreference | STEWARD DV, 1981, IEEE T ENG MANAGE, V28, P71 | - |
dc.description.tc | 0 | - |
dc.identifier.wosid | 000262671900009 | - |
- Appears in Collections:
- Files in This Item:
- There are no files associated with this item.
Item View & Download Count