Cost Performance Comparison of Design-Build and Design-Bid-Build Focusing on Mediator Effect : 낙찰률 매개효과를 중심으로 한 설계 및 시공 일괄입찰과 분리입찰의 비용성과 실증비교

DC Field Value Language
dc.contributor.advisor이현수-
dc.contributor.author문효수-
dc.date.accessioned2017-07-14T04:00:21Z-
dc.date.available2017-07-14T04:00:21Z-
dc.date.issued2015-08-
dc.identifier.other000000066778-
dc.identifier.urihttps://hdl.handle.net/10371/124102-
dc.description학위논문 (석사)-- 서울대학교 대학원 : 건축학과 건축공학전공, 2015. 8. 이현수.-
dc.description.abstractAccording to previous research, the reason why Design-Build(hereinafter referred to as DB) outperforms Design-Bid-Build(hereinafter referred to as DBB) in terms of cost is due to less change orders. However, if biddropping was low for DBB resulting into change orders, and little difference between completion cost and budget cost, then it would be wrong to conclude that DB is superior due to less change orders. Therefore, in order to confirm such misjudgment, the attempt to comprehensively analyze biddropping, change order and delivery method were made as previous methods had analyzed either the relationship between delivery method and change order, or biddropping and change order. This research uses a path analysis, which simultaneously compares effect sizes on change orders according to delivery method and biddropping based on the project type, and validated the mediator effect. The research proved that validating DB is superior to DBB due to less change orders cannot be validated as biddropping caused a mediator effect by intervening between the delivery method and change order for specific project types. Therefore, the mechanism of delivery method acts on change orders through biddropping was established. Also, the identity of biddropping was investigated in a different approach from previous research. Based on this result, this research is expected to help determine a delivery method by considering the mediator effect of specific projects and evaluate performance of the selected delivery method.-
dc.description.tableofcontentsChapter 1 Introduction 1
1.1 Research Background and Objective 1
1.2 Research Scope and Process 3

Chapter 2 Preliminary Study 6
2.1 Project Delivery Method 7
2.2 Cost Performance Evaluation of Delivery Methods 9
2.3 Limitations on Previous Studies and Establishing Research Hypothesis 15
2.4 Research Methodologies 17
2.5 Summary 19

Chapter 3 Path Model and Data Collection for Cost Performance Comparison 20
3.1 Building a Path Model 21
3.2 Data Collection and Analysis 25
3.3 Summary 31

Chapter 4 Hypothesis Testing for Cost Performance Comparison and Mediator Effect 32
4.1 Testing Results 33
4.2 Comparison of Cost Performance Evaluations.. 35
4.3 Testing for Mediator Effect of Biddropping 41
4.4 Summary.. 46


Chapter 5 Conclusions 47
5.1 Results and Discussion 47
5.2 Contributions 49
5.3 Limitations and Further Studies 50

Appendices 51

Reference 58

Abstract (Korean) 64
-
dc.formatapplication/pdf-
dc.format.extent1582613 bytes-
dc.format.mediumapplication/pdf-
dc.language.isoen-
dc.publisher서울대학교 대학원-
dc.subjectMediator Effect of Biddropping-
dc.subjectDelivery Method-
dc.subjectDesign-Bid-
dc.subjectDesign-Bid-Build-
dc.subjectCost Performance-
dc.subjectChange Order-
dc.subject.ddc690-
dc.titleCost Performance Comparison of Design-Build and Design-Bid-Build Focusing on Mediator Effect-
dc.title.alternative낙찰률 매개효과를 중심으로 한 설계 및 시공 일괄입찰과 분리입찰의 비용성과 실증비교-
dc.typeThesis-
dc.description.degreeMaster-
dc.citation.pages65-
dc.contributor.affiliation공과대학 건축학과-
dc.date.awarded2015-08-
Appears in Collections:
Files in This Item:

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share