Publications

Detailed Information

Probabilistic duration model for high-rise building construction

DC Field Value Language
dc.contributor.advisor이현수-
dc.contributor.author신재원-
dc.date.accessioned2009-11-18T03:46:05Z-
dc.date.available2009-11-18T03:46:05Z-
dc.date.copyright2006.-
dc.date.issued2006-
dc.identifier.urihttp://dcollection.snu.ac.kr:80/jsp/common/DcLoOrgPer.jsp?sItemId=000000047406eng
dc.identifier.urihttps://hdl.handle.net/10371/12923-
dc.descriptionThesis(master`s)--서울대학교 대학원 :건축학과,2006.eng
dc.format.extentiv, 84 leaveseng
dc.language.isoen-
dc.publisher서울대학교 대학원eng
dc.subject초고층 건축 공사eng
dc.subjectHigh-rise Building Constructioneng
dc.subject골조공사eng
dc.subjectStructural Workeng
dc.subject날씨 영향 요인eng
dc.subjectWeather Influenceeng
dc.subject시뮬레이션eng
dc.subjectSimulationeng
dc.subject확률적 공기산정eng
dc.subjectProbabilistic Duration Forecastingeng
dc.titleProbabilistic duration model for high-rise building constructioneng
dc.typeThesis-
dc.contributor.department건축학과-
dc.description.degreeMastereng
Appears in Collections:
Files in This Item:
There are no files associated with this item.

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share