Publications

Detailed Information

Simulation-Based Work Plan Verification in Shipyards

Cited 6 time in Web of Science Cited 12 time in Scopus
Authors

Lee, Dong Kun; Shin, Jong Gye; Kim, Youngmin; Jeong, Yong Kuk

Issue Date
2014-05
Publisher
Society of Naval Architects and Marine Engineers
Citation
Journal of Ship Production and Design, Vol.30 No.2, pp.49-57
Abstract
The productivity of a shipyard depends on how efficiently and systematically its limited resources are managed and used. Korean shipyards, the most competitive in the world, have developed and operate their own production management systems to attain high productivity, each of which reflects the unique characteristics of a specific company. Recently, research on simulation methods to enhance production management systems has been gaining popularity. Production management based on simulations rejects decision-making based on experience and intuition and values the establishment of improvement methods based on quantitative and concrete data. In this article, simulation is applied to the work plan as part of the production planning in shipyards. To this end, the work planning processes and planning systems are analyzed. Based on this analysis, a simulation model and application system are suggested. By using the results obtained in this study, it is expected that shipyards can construct cycles for establishing, simulating, and analyzing work plans, enabling the establishment of more precise production plans.
ISSN
2158-2866
URI
https://hdl.handle.net/10371/195268
DOI
https://doi.org/10.5957/JSPD.30.2.130032
Files in This Item:
There are no files associated with this item.
Appears in Collections:

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share