Publications

Detailed Information

Transfer Batch Scheduling for a Two-stage Flowshop with Identical Parallel Machines At Each Stage

Cited 21 time in Web of Science Cited 24 time in Scopus
Authors

Kim, J-S; Kang, Suk-Ho; Lee, SM

Issue Date
1997-10
Publisher
Elsevier
Citation
Omega, 1997, 25, 547
Keywords
two-stage flexible flowshoptransfer batch schedulinmakespan
Abstract
This paper considers the transfer batch scheduling problem for a two-stage flowshop with identical
parallel machines at each stage. Two cases of separable and inseparable setup times and processing
times are examined. A scheduling rule similar to Johnson's rule is suggested to minimize makespan.
The scheduling method developed in this paper subsumes many existing methods for two-stage
flowshop makespan minimization. A numerical example is presented to illustrate the scheduling
method.
ISSN
0305-0483
Language
English
URI
https://hdl.handle.net/10371/7587
DOI
https://doi.org/10.1016/S0305-0483(97)00015-7
Files in This Item:
There are no files associated with this item.
Appears in Collections:

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share