Browse
S-Space
College of Engineering/Engineering Practice School (공과대학/대학원)
Dept. of Industrial Engineering (산업공학과)
Theses (Master's Degree_산업공학과)
Minimizing maximum completion time in a no-wait flexible flow shop scheduling problem : 복합 흐름 공정의 최대 작업 종료시간 최소화에 관한 연구
- Authors
- Advisor
- 정성진
- Issue Date
- 2005
- Publisher
- 서울대학교 대학원
- Keywords
- 스케쥴링 ; scheduling ; 복합 흐름 공정 ; flexible flow shop ; 최대 작업 종료 시간 ; makespan ; 혼합정수계획법 ; mixed integer programming ; 유전자 알고리즘 ; genetic algorithm
- Description
- Thesis(master`s)--서울대학교 대학원 :산업공학과,2005.
- Language
- English
- URI
- http://dcollection.snu.ac.kr:80/jsp/common/DcLoOrgPer.jsp?sItemId=000000050979
https://hdl.handle.net/10371/11777
- Files in This Item: There are no files associated with this item.
Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.