Simulation Model to Optimize Transfer Operation of Construction Lifts for Super High-rise Buildings : 초고층 건축공사에서의 환승운영방식 리프트 시뮬레이션 모델 및 최적화 연구

DC Field Value Language
dc.contributor.advisor이현수-
dc.contributor.author문주용-
dc.date.accessioned2017-07-14T03:57:59Z-
dc.date.available2017-07-14T03:57:59Z-
dc.date.issued2015-02-
dc.identifier.other000000025380-
dc.identifier.urihttps://hdl.handle.net/10371/124076-
dc.description학위논문 (석사)-- 서울대학교 대학원 : 건축학과, 2015. 2. 이현수.-
dc.description.abstractRecently, the number of super high-rise building projects have been increased after recovering from international financial crisis. In super high-rise building project, vertical lifting is critical to overall project productivity, due to its limited number of lifting equipment. Also for projects which buildings height are higher than 400m, transfer operation in lifting is inevitable because of lifts maximum lifting height. In transfer operation, setting a transfer floor is essential for saving lifting time of resources.
In this research, using discrete event simulation modeling with AnyLogic 7.0 software, module of a single lift operation has been established, and with multiple modules, the simulation model of lift system with transfer operation has been built. Based on this model, optimization model for finding the optimal transfer floor has been built on OptQuest software, using the metaheuristic optimization method. By using this optimization model, the method of optimizing a transfer floor for workers during the morning peak time has been proposed.
Comparing to the result of the case which transfer floor is designated to the middle floor, setting optimized transfer floor significantly decreased the total lifting time of workers. Also patterns of the change of lifting time on the variation of transfer floors were presented through the analysis in the research.
By using proposed simulation and optimization tool, saving budget and time through increasing available working hour is expected.
-
dc.description.tableofcontentsChapter 1 Introduction 1

1.1 Research Background and Objective 1
1.2 Research Scope and Methodologies 4
1.3 Research Process 5

Chapter 2 Preliminary Study 8

2.1 Types and Characteristics of Lift Operation 8
2.2 Literature Review on Lift Operation 9
2.3 Descrete Event Simulation 11
2.4 Optimization with the Optimum Value Search 12
2.5 Summary 13

Chapter 3 Construction Vertical Lifting Simulation with Transfer Operation 14

3.1 Build a Model for Single Lift 14
3.2 Simulation Model of Lift with Transfer Operation 23
3.3 Summary 26

Chapter 4 Optimization and Experiment on the Mock Case 27

4.1 Optimization Model 27
4.2 Experiment on Optimizing Transfer Floor with the Mock Case.. 31
4.3 Analysis of Lifting Time Variation with Changes of Transfer Floor.. 34
4.4 Summary 38

Chapter 5 Conclusion 39

5.1 Results and Contribution 39
5.2 Limitation and Future Study 41
5.3 Conclusion 42

Appendix 43

Reference 51

Abstract (Korean) 56
-
dc.formatapplication/pdf-
dc.format.extent910011 bytes-
dc.format.mediumapplication/pdf-
dc.language.isoen-
dc.publisher서울대학교 대학원-
dc.subject건설 리프트-
dc.subject환승운영방식-
dc.subject효율성-
dc.subject초고층 건축공사-
dc.subject환승층-
dc.subject최적화-
dc.subject시뮬레이션-
dc.subject.ddc690-
dc.titleSimulation Model to Optimize Transfer Operation of Construction Lifts for Super High-rise Buildings-
dc.title.alternative초고층 건축공사에서의 환승운영방식 리프트 시뮬레이션 모델 및 최적화 연구-
dc.typeThesis-
dc.contributor.AlternativeAuthorMoon, Jooyong-
dc.description.degreeMaster-
dc.citation.pagesv, 57-
dc.contributor.affiliation공과대학 건축학과-
dc.date.awarded2015-02-
Appears in Collections:
Files in This Item:

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share