Production Scheduling for Multi Project Modular Construction based on Genetic Algorithm

Cited 0 time in Web of Science Cited 0 time in Scopus
Authors

김민정

Advisor
박문서
Major
공과대학 건축학과
Issue Date
2016-02
Publisher
서울대학교 대학원
Keywords
모듈러 건축모듈러 유닛다중 프로젝트공장 공정 계획유전자 알고리즘
Description
학위논문 (석사)-- 서울대학교 대학원 : 건축학과, 2016. 2. 박문서.
Abstract
The modular construction has several advantages such as high quality of product, safe work condition and short construction duration. The production scheduling of modular construction should consider time frame of factory production, transport and erection process with limited resources (e.g., modular units, transporter and workers). The production scheduling of multi modular construction project manages the modular constructions characteristics and diversity of projects, as a type of modular unit, modular unit quantities, and date for delivery. However, current modular production scheduling techniques are weak in dealing with resource interactions and each project requirement in multi modular construction project environments. Inefficient allocation of resources during multi modular construction project may cause delays and cost overruns to construction operation. In this circumstance, this research suggests a production scheduling model for schedule optimization of multi project of modular construction, using genetic algorithm as one of the powerful method for schedule optimization with multiple constrained resources. Comparing to the result of the existed schedule of case study, setting optimized scheduling for multi project decreases the total factory production schedule. By using proposed optimization tool, efficient allocation of resource and saving project time is expected.
Language
English
URI
https://hdl.handle.net/10371/124119
Files in This Item:
Appears in Collections:

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share