Publications

Detailed Information

부하지속곡선을 이용한 비점오염원 우선관리 지역 선정 및 관리목표 설정 연구 : Identifying priority area for nonpoint source pollution management and setting up load reduction goals using the load duration curve

Cited 0 time in Web of Science Cited 0 time in Scopus
Authors

장선숙; 지현서; 김학관

Issue Date
2018-09
Publisher
한국농공학회
Citation
한국농공학회논문집, Vol.60 No.5, pp.17-27
Abstract
The objective of this study is to identify the priority area where the nonpoint source pollution (NPS) management is required and to set up the loadreduction goals for the identified priority area. In this study, the load duration curve (LDC) was first developed using the flow and water quality dataobserved at 286 monitoring stations. Based on the developed LDC, the priority area for the NPS pollution management was determined using athree-step method. The 24 watersheds were finally identified as the priority areas for the NPS pollution management. The water quality parameters ofconcern in the priority areas were the total phosphorus or chemical oxygen demand. The load reduction goals, which were calculated as the percentreduction from current loading levels needed to meet target water quality, ranged from 67.9% to 97.2% during high flows and from 40.3% to 69.5%during moist conditions, respectively. The results from this study will help to identify critical watersheds for NPS program planning purposes. Inaddition, the process used in this study can be effectively applied to identify the pollutant of concern as well as the load reduction target.
ISSN
1738-3692
Language
Korean
URI
https://hdl.handle.net/10371/149932
DOI
https://doi.org/10.5389/KSAE.2018.60.5.17
Files in This Item:
Appears in Collections:

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share