Decision Making on Power Plant Development in Myanmar using AHP : AHP를 이용한 미얀마 발전소 건설 의사결정

DC Field Value Language
dc.contributor.advisor구윤모-
dc.contributor.authorMyo Thant Oo-
dc.date.accessioned2021-11-30T05:55:27Z-
dc.date.available2021-11-30T05:55:27Z-
dc.date.issued2021-02-
dc.identifier.other000000164346-
dc.identifier.urihttps://hdl.handle.net/10371/176316-
dc.identifier.urihttps://dcollection.snu.ac.kr/common/orgView/000000164346ko_KR
dc.description학위논문 (석사) -- 서울대학교 대학원 : 공과대학 협동과정 기술경영·경제·정책전공, 2021. 2. 구윤모.-
dc.description.abstractMyanmar, one of the countries is facing many difficulties in generating and providing electricity to all needs in the country. Especially in many villages, rural areas, remote areas, and far from the national grid areas do not have electricity access. Even though, Myanmar, an abundant endowment of crude oil and natural gas, and other energy resources compared to other developing countries. To extract those resources at a reasonable production cost in order to fulfill the demand in domestic, Myanmar is not yet. Recently, the possibility to develop lessening production is still low because of the lack of technology and low investment from local and foreign.
This study aims by using Analytic Hierarchy Process (AHP) to find the appropriate power plant development planning for Myanmar by exposing the economic impact, production, and domestic utilization, with those of other natural gas producer countries. This study analyzes the factors that caused significant effects for optimal power plant development among four criteria (technology, economic, socio-political, and environmental) by using Analytical Hierarchy Process (AHP) method. This study also completed a survey to rank the optimal power plant development as the alternatives suggested by the government plans. This study results can be used as a basis of decision-making for electrification in the Government of Myanmar.
-
dc.description.abstract미얀마는 전력의 발전과 공급에 어려움을 겪고 있는 국가이다. 특히 마을, 농촌 지역과 같은 국가 그리드 지역에서 멀리 떨어진 곳은 전력의 접근성이 매우 낮다. 미얀마는 다른 개발도상국에 비해 원유와 천연 가스 및 기타 에너지 자원이 풍부함에도, 이러한 에너지 자원을 국내 전력 수요를 충족시키기 위해 합리적인 비용으로 사용하지 못하고 있다. 최근까지도 기술력의 부족과, 국내외 투자가 적기 때문에 이 문제를 해결하지 못하고 있다.
이 연구는 계층적 분석방법(AHP, Analytic Hierarchy Process)과 다른 천연 가스 생산국들의 경제적 영향, 생산 및 국내 이용률을 참조하여 미얀마의 실정에 맞는 최적의 발전소 개발계획을 도출하는 것을 목표로 한다. 본 연구에서는 계층적 분석방법 적용을 위해 기술, 경제, 사회 및 정치, 그리고 환경이라는 4 가지 기준을 수립하여 이 중 어느 요인이 최적의 발전소 개발계획에 유의미한 영향을 미치는지를 분석하였다. 또한, 본 연구에서는 설문조사를 통해 미얀마의 정부에서 제시한 발전소 개발계획에 대한 순위를 분석하였다. 본 연구의 결과는 미얀마 정부의 전기화를 위한 의사결정의 기초 연구로써 사용될 수 있다.
-
dc.description.tableofcontentsAbstract iii
Table of Contents v
List of Tables vii
List of Figures viii
Chapter 1. Introduction 1
1.1 Research Motivation 1
1.2 Research Objectives, Questions, Scope and Structure 2
1.2.1 Research Objectives 2
1.2.2 Research Questions 3
1.2.3 Research Scope 3
1.2.4 Research Structure 3
Chapter 2. Myanmar Power System Background 5
2.1 Development of Electricity in Myanmar 5
2.2 Electricity Development Plan 12
2.2.1 Power Plant Sector 13
2.2.2 Myanmars Intended Nationally Determined Contribution 17
Chapter 3. Literature Review 19
3.1 Multi-Criteria Decision Analysis (MCDA) 19
3.2 Analytical Hierarchy Process 21
Chapter 4. Methodology 26
4.1 Methodological Framework 26
4.2 Criteria Descriptions 28
4.2.1 Description of Main Criteria 28
4.2.2 Description of Sub-Criteria 30
4.3 Progression of the Survey 35
4.4 Survey on the Analytic Hierarchy Process Pairwise Comparison 36
4.5 Survey for Selecting of the Alternatives for Optimal Power Plant Development in Myanmar 38
Chapter 5. Research Results 40
5.1 Consistency Ratio of Main Criteria 41
5.2 Estimated Weight of Main Criteria 41
5.3 Estimated Weight of Sub-Criteria 42
5.4 Estimated Alternative for Optimal Power Plant Development 47
Chapter 6. Conclusion 50
6.1 Conclusion and Implementation 50
6.2 Study Limitations and Future Work 53
Bibliography 54
Appendix 58
Abstract (Korean) 2
-
dc.format.extentviii, 95-
dc.language.isoeng-
dc.publisher서울대학교 대학원-
dc.subjectElectrification-
dc.subjectAnalytical Hierarchy Process-
dc.subjectMulti-Criteria Decision Analysis-
dc.subjectMyanmar-
dc.subjectMinistry of Electricity and Energy-
dc.subject전기화-
dc.subject계층적 분석방법-
dc.subject다기준 의사결정방법론-
dc.subject미얀마-
dc.subject미얀마 전력에너지부-
dc.subject.ddc658.514-
dc.titleDecision Making on Power Plant Development in Myanmar using AHP-
dc.title.alternativeAHP를 이용한 미얀마 발전소 건설 의사결정-
dc.typeThesis-
dc.typeDissertation-
dc.contributor.AlternativeAuthor묘딴우-
dc.contributor.department공과대학 협동과정 기술경영·경제·정책전공-
dc.description.degreeMaster-
dc.date.awarded2021-02-
dc.contributor.majorIEPP-
dc.identifier.uciI804:11032-000000164346-
dc.identifier.holdings000000000044▲000000000050▲000000164346▲-
Appears in Collections:
Files in This Item:

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share