Reliability and Stability Buffering Approach: Focusing on the Issues of Errors and Changes in Concurrent Design and Construction Projects

DC Field Value Language
dc.contributor.authorLee, SangHyun-
dc.contributor.authorPeña-Mora, Feniosky-
dc.contributor.authorPark, Moon-seo-
dc.date.accessioned2009-12-04T06:53:17Z-
dc.date.available2009-12-04T06:53:17Z-
dc.date.issued2006-
dc.identifier.citationJ. Constr. Eng. Manage., 132(5), 452-464en
dc.identifier.issn0733-9364-
dc.identifier.urihttps://hdl.handle.net/10371/18683-
dc.description.abstractThis paper proposes a new buffering approach, reliability and stability buffering, as a means to reduce uncertainty caused by errors and changes, in particular, when concurrent design and construction is applied to an infrastructure project. The proposed buffering provides a proactive mechanism to protect the planned performance of a project with a flexibly located and systemically sized buffer. For its implementation, the reliability and stability buffering is incorporated into a dynamic design and construction project model, which simulates the impacts of errors and changes on design and construction performance and evaluates the effectiveness of the proposed buffers. Applying this buffering approach into the infrastructure project in Massachusetts, this paper concludes that (1) the amount of hidden errors and latent changes was reduced; (2) the flexibly located and distributed buffers helped identify the predecessors' errors and changes in concurrent design and construction; (3) the impacts of hidden errors and changes were minimized, preventing their ripple effect on the succeeding activities; and (4) the quality of the coordination process was increased. Thus it shows great potential to protect design and construction performance against uncertainty in concurrent design and construction delivery of civil infrastructure projects. Such benefit obtained from the proposed buffering should be relevant to researchers and practitioners because it provides the base for future investigation for the strategic utilization of schedule buffers in an uncertain environment as well as the guideline for their effective use in practice.en
dc.description.sponsorshipThe writers would like to acknowledge the contribution to
this paper by Joe Peck, Corporate Planning and Scheduling
Manager, currently with Charles River Associates, Bill Lemoine,
Vice President, and John Foster, Senior Project Manager at the
Modern Continental Company. The writers would like to thank Philip Helmes, Vice President, and Margaret Fulenwider, Senior
Consultant from Charles River Associates. Also, the writers appreciate
the assistance from Dr. Mikio Shoji, Senior Managing
Director at Kajima Corporation. The writers would like to acknowledge
the financial support for this research received from
Charles River Associates, Kajima Corporation, the National Science
Foundation CAREER and PECASE Award CMS-9875557,
and the National Science Foundation Award CMS-0324501 is
greatly appreciated. Any opinions, findings, and conclusions or
recommendations expressed in this publication are those of the
writers and do not necessarily reflect the views of the National
Science Foundation.
en
dc.language.isoenen
dc.publisherAmerican Society of Civil Engineersen
dc.subjectSchedulingen
dc.subjectChange managementen
dc.subjectSimulationen
dc.subjectFast track constructionen
dc.titleReliability and Stability Buffering Approach: Focusing on the Issues of Errors and Changes in Concurrent Design and Construction Projectsen
dc.typeArticleen
dc.contributor.AlternativeAuthor이상현-
dc.contributor.AlternativeAuthor박문서-
dc.identifier.doi10.1061/(ASCE)0733-9364(2006)132:5(452)-
Appears in Collections:
Files in This Item:
There are no files associated with this item.

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share