Publications

Detailed Information

사례연구를 통한 수량변화분석 기반 건축공사비 개산견적 모델 분석- 주상복합건물 프로젝트의 골조공사비를 중심으로 : Analyzing the Schematic Cost Estimating Model Based on Quantity Variation in Building Projects Using the Case Study - Applying to Structure Cost of Residential Complex Building Project

DC Field Value Language
dc.contributor.author손보식-
dc.contributor.author박문서-
dc.contributor.author이현수-
dc.contributor.author임대희-
dc.date.accessioned2009-12-04T07:02:11Z-
dc.date.available2009-12-04T07:02:11Z-
dc.date.issued2008-
dc.identifier.citation대한건설학회논문집 구조계, 24(6), pp.109-118en
dc.identifier.issn1226-9107-
dc.identifier.urihttp://uci.or.kr/G300-jX1031001.v24n6p109-
dc.identifier.urihttps://hdl.handle.net/10371/18687-
dc.description.abstractRecently, the market environment of construction industry in Korea is undergoing rapid changes and construction companies are struggling to survive in keen competition. One of those is the change of project delivery system, which results that decision making related to a project should be made in the early stage of the project. Thus, the importance of schematic cost estimating is being emphasized. Using a case study, this research analyzes and validates the Quantity Based Active Schematic cost Estimating (Q- BASE) model and prototype developed and proposed on the precedent paper to improve accuracy and reliability compared with the traditional method in building projects.
Case study result on structure cost of two real residential complex building projects using proposed model shows that difference between actual cost and estimated cost was smaller than using the existing model by regression analysis technique or artificial neural network technique. Considering that within 5% deviation is small amount in the early stage of cost estimating, the results suggest that the proposed model guarantees accuracy and reliability. In addition, the sensitivity analysis in case study suggests that this model is capable of tracing change in quantity and of items and change in material cost and labor cost. This enables us to more actively cope with changes of design alternatives and market environment. Moreover, it takes into account relationship with detailed cost estimating.
en
dc.description.sponsorship본 연구는 건설교통부 건설교통R&D정책인프라사업의 연구비지원(과제번호: 06 기반구축 A03 / 과제번호: 기반구축 D05-01)에 의해 수행되었음.en
dc.language.isoko-
dc.publisher대한건축학회 = Architectural Institute of Koreaen
dc.subject주상복합건물en
dc.subject골조공사비en
dc.subject개산견적en
dc.subject수량변화en
dc.subject빌딩구성요소en
dc.subject사례연구en
dc.subjectResidential Complex Buildingen
dc.subjectStructure Costen
dc.subjectSchematic Cost Estimatingen
dc.subjectQuantity Variationen
dc.subjectBuilding Element(BE)en
dc.subjectCase Studyen
dc.title사례연구를 통한 수량변화분석 기반 건축공사비 개산견적 모델 분석- 주상복합건물 프로젝트의 골조공사비를 중심으로en
dc.title.alternativeAnalyzing the Schematic Cost Estimating Model Based on Quantity Variation in Building Projects Using the Case Study - Applying to Structure Cost of Residential Complex Building Projecten
dc.typeArticleen
dc.contributor.AlternativeAuthorSon, Bo-Sik-
dc.contributor.AlternativeAuthorPark, Moon-Seo-
dc.contributor.AlternativeAuthorLee, Hyun-Soo-
dc.contributor.AlternativeAuthorLim, Dae-Hee-
Appears in Collections:
Files in This Item:

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share