Publications

Detailed Information

Analysis on Hull Block Erection Process Considering Variability

DC Field Value Language
dc.contributor.authorShen, Huiqiang-
dc.contributor.authorLee, Yonggil-
dc.contributor.authorJeong, Yong-kuk-
dc.contributor.authorWoo, Jong Hun-
dc.date.accessioned2023-09-25T05:52:25Z-
dc.date.available2023-09-25T05:52:25Z-
dc.date.created2021-11-08-
dc.date.issued2021-05-
dc.identifier.citationJournal of Ship Production and Design, Vol.37 No.2, pp.67-77-
dc.identifier.issn2158-2866-
dc.identifier.urihttps://hdl.handle.net/10371/195618-
dc.description.abstractThe hull block erection network process, which is performed during the master production planning stage of the shipyard, is frequently delayed because of limited resources, workspace, and block preparation ratio. In this study, a study to predict the delay with respect to the block erection schedule is conducted by considering the variability of the block preparation ratio based on the discrete event simulation algorithm. It is confirmed that the variation of the key event observance ratio is confirmed according to the variability caused by the block erection process, which has the minimum lead time in a limited resource environment, and the block preparation ratio. Furthermore, the optimal pitch value for the key event concordance is calculated based on simulation results.-
dc.language영어-
dc.publisherSociety of Naval Architects and Marine Engineers-
dc.titleAnalysis on Hull Block Erection Process Considering Variability-
dc.typeArticle-
dc.identifier.doi10.5957/JSPD.07190036-
dc.citation.journaltitleJournal of Ship Production and Design-
dc.identifier.wosid000710564500001-
dc.identifier.scopusid2-s2.0-85115446710-
dc.citation.endpage77-
dc.citation.number2-
dc.citation.startpage67-
dc.citation.volume37-
dc.description.isOpenAccessN-
dc.contributor.affiliatedAuthorWoo, Jong Hun-
dc.type.docTypeArticle-
dc.description.journalClass1-
dc.subject.keywordPlusPRODUCTION MANAGEMENT-
dc.subject.keywordPlusSIMULATION-
dc.subject.keywordPlusSYSTEM-
dc.subject.keywordPlusSYSTEMATIZATION-
dc.subject.keywordPlusADVANCEMENT-
dc.subject.keywordAuthorshipbuilding-
dc.subject.keywordAuthorblock erection-
dc.subject.keywordAuthordiscrete event simulation-
dc.subject.keywordAuthorblock preparation ratio-
Appears in Collections:
Files in This Item:
There are no files associated with this item.

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share