Publications

Detailed Information

Application of dynamic time warping to the recognition of mixed equipment activities in cycle time measurement

Cited 73 time in Web of Science Cited 80 time in Scopus
Authors

Kim, Hyunsoo; Ahn, Changbum R.; Engelhaupt, David; Lee, SangHyun

Issue Date
2018-03
Publisher
Elsevier B.V.
Citation
Automation in Construction, Vol.87, pp.225-234
Abstract
Analyzing and measuring construction equipment operation are key tasks for managing construction projects. In monitoring construction equipment operation, the cycle-time provides fundamental information. Traditional cycle-time measurement methods have been limited by requiring significant efforts such as additional observers, time, and cost. Thus, this study investigates the feasibility of measuring cycle times by using inertial measurement units (IMUs) embedded in a smartphone. Because the mixed activities of construction equipment involve simultaneous actions of multiple parts, they cause low accuracy in equipment activity classification and cycle-time measurement. To enhance the recognition of these mixed activities and translate the results into reliable cycle time measurements, a dynamic time warping (DTW) algorithm was applied and the DTW distances of IMU signals were used as additional features in activity classification. To test its feasibility, data was collected on-site and the excavator's operation was recorded via IMUs embedded in a smartphone attached to a cabin. Using DTW, the suggested method achieved 91.83% accuracy for cycle-time measurement. This result demonstrates an opportunity to use operators' prevalent mobile devices to measure and report their equipment's cycle times in a cost-effective and continuous manner.
ISSN
0926-5805
URI
https://hdl.handle.net/10371/203259
DOI
https://doi.org/10.1016/j.autcon.2017.12.014
Files in This Item:
There are no files associated with this item.
Appears in Collections:

Related Researcher

  • College of Engineering
  • Department of Architecture & Architectural Engineering
Research Area Computing in Construction, Management in Construction

Altmetrics

Item View & Download Count

  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Share