Large engineering project risk management using a Bayesian belief network
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Lee, Eunchang | - |
dc.contributor.author | Park, Yongtae | - |
dc.contributor.author | Shin, Jong Gye | - |
dc.date.accessioned | 2012-03-05T02:29:35Z | - |
dc.date.available | 2012-03-05T02:29:35Z | - |
dc.date.issued | 2009-04-01 | - |
dc.identifier.citation | EXPERT SYSTEMS WITH APPLICATIONS; Vol.36 3; 5880-5887 | - |
dc.identifier.issn | 0957-4174 | - |
dc.identifier.uri | https://hdl.handle.net/10371/75322 | - |
dc.description.abstract | This paper presents a scheme for large engineering project risk management using a Bayesian belief network and applies it to the Korean shipbuilding industry. Twenty-six different risks were deduced from expert interviews and a literature review. A survey analysis was conducted on 252 experts from 11 major Korean shipbuilding companies in April 2007. The overall major risks were design change, design manpower, and raw material supply as internal risks, and exchange rate as external risk in both large-scale and medium-sized shipbuilding companies. Differences of project performance risks between large-scale and medium-sized shipbuilding companies were identified. Exceeding time schedule and specification discontent were more important to large-scale shipbuilding companies, while exceeding budget and exceeding time schedule were more important to medium-sized shipbuilding companies. The change of project performance risks was measured by risk reduction activities of quality management, and strikes at headquarters and subcontractors, in both large-scale and medium-sized shipbuilding companies. The research results should be valuable in enabling industrial participants to manage their large engineering project risks and in extending our understanding of Korean shipbuilding risks. (C) 2008 Elsevier Ltd. All rights reserved. | - |
dc.language.iso | en | - |
dc.publisher | PERGAMON-ELSEVIER SCIENCE LTD | - |
dc.subject | Risk management in large engineering projects | - |
dc.subject | Shipbuilding industry | - |
dc.subject | Bayesian belief network | - |
dc.title | Large engineering project risk management using a Bayesian belief network | - |
dc.type | Article | - |
dc.contributor.AlternativeAuthor | 이은창 | - |
dc.contributor.AlternativeAuthor | 박용태 | - |
dc.contributor.AlternativeAuthor | 신종계 | - |
dc.identifier.doi | 10.1016/j.eswa.2008.07.057 | - |
dc.citation.journaltitle | EXPERT SYSTEMS WITH APPLICATIONS | - |
dc.description.citedreference | Uusitalo L, 2007, ECOL MODEL, V203, P312, DOI 10.1016/j.ecolmodel.2006.11.033 | - |
dc.description.citedreference | *IBKERI, 2007, TRENDS MED TO LONG T, P83006 | - |
dc.description.citedreference | *CLARKS RES SERV, 2007, SHIPP SECT REP CLARK, P83006 | - |
dc.description.citedreference | ULEGINE F, 2007, TRANSPORT RES A-POL, V41, P40 | - |
dc.description.citedreference | Gatti S, 2007, EUR FINANC MANAG, V13, P135 | - |
dc.description.citedreference | Weimer-Jehle W, 2006, TECHNOL FORECAST SOC, V73, P334, DOI 10.1016/j.techfore.2005.06.005 | - |
dc.description.citedreference | LING FYY, 2006, INT PROJECT MANAGEME, V24, P261 | - |
dc.description.citedreference | ABELLAN J, 2006, P 3 EUR WORKSH PROB, P1 | - |
dc.description.citedreference | MOYST H, 2005, J SHIP PRODUCTION, V21, P186 | - |
dc.description.citedreference | SAYNISCH M, 2005, WORLD FUTURES J GEN, V61, P555 | - |
dc.description.citedreference | COOPER DF, 2005, PROJECT RISK MANAGEM, P83006 | - |
dc.description.citedreference | Kwak YH, 2004, TECHNOVATION, V24, P915, DOI 10.1016/S0166-4972(03)00033-6 | - |
dc.description.citedreference | Fan CF, 2004, J SYST SOFTWARE, V73, P193, DOI 10.1016/j.jss.2003.12.032 | - |
dc.description.citedreference | LYONS T, 2004, INT J PROJECT MANAGE, V22, P51, DOI 10.1016/S0263-7863(03)00005-X | - |
dc.description.citedreference | ALQUIER AM, 2004, IPMA INT S NORDNET 2, P83006 | - |
dc.description.citedreference | BRODDA J, 2004, J SHIP PRODUCTION, V20, P100 | - |
dc.description.citedreference | BALOI D, 2003, INT J PROJ MANAG, V21, P261, DOI 10.1016/S0263-7863(02)00017-0 | - |
dc.description.citedreference | PHELPS TA, 2003, J SHIP PRODUCTION, V19, P16 | - |
dc.description.citedreference | del Cano A, 2002, J CONSTR ENG M ASCE, V128, P473, DOI 10.1061/)ASCE)-0733-9364(2002)128:6(473) | - |
dc.description.citedreference | Cheng J, 2002, ARTIF INTELL, V137, P43 | - |
dc.description.citedreference | KOENIG PC, 2002, J SHIP PRODUCTION, V18, P13 | - |
dc.description.citedreference | PATTERSON FD, 2002, INT J PROJ MANAG, V20, P365 | - |
dc.description.citedreference | Carr V, 2001, ADV ENG SOFTW, V32, P847 | - |
dc.description.citedreference | MILLER R, 2001, INT J PROJECT MANAGE, V19, P437 | - |
dc.description.citedreference | KUCHTA D, 2001, INT J PROJECT MANAGE, V19, P305 | - |
dc.description.citedreference | RAZ T, 2001, INT J PROJECT MANAGE, V19, P9 | - |
dc.description.citedreference | BACCARINI D, 2001, INT J PROJECT MANAGE, V19, P139 | - |
dc.description.citedreference | HAN SH, 2001, J CONSTR ENG M ASCE, V127, P255 | - |
dc.description.citedreference | DEKLERT AM, 2001, MANAGEMENT ENG TECHN, P570 | - |
dc.description.citedreference | LU BZ, 2000, MARITIME POLICY MANA, V27, P71 | - |
dc.description.citedreference | DUFFEY MR, 1999, J ENG VALUATION COST, V2, P285 | - |
dc.description.citedreference | EDWARDS PJ, 1998, ENG CONSTRUCTION ARC, V5, P339 | - |
dc.description.citedreference | KUO C, 1998, MANAGING SHIP SAFETY, P83006 | - |
dc.description.citedreference | Heckerman D, 1997, DATA MIN KNOWL DISC, V1, P79 | - |
dc.description.citedreference | CHAPMAN C, 1997, INT J PROJECT MANAGE, V15, P273 | - |
dc.description.citedreference | AKINTOYE AS, 1997, INT J PROJECT MANAGE, V15, P31 | - |
dc.description.citedreference | MOLAK V, 1997, FUNDAMENTALS RISK AN, P83006 | - |
dc.description.citedreference | VanderGaag LC, 1996, COMPUT J, V39, P97 | - |
dc.description.citedreference | TUMMALA VMR, 1996, INT J QUALITY RELIAB, V13, P53 | - |
dc.description.citedreference | WILLIAMS T, 1995, EUR J OPER RES, V85, P18 | - |
dc.description.citedreference | HECKERMAN D, 1995, COMMUN ACM, V38, P24 | - |
dc.description.citedreference | ZHI H, 1995, INT J PROJECT MANAGE, V13, P231 | - |
dc.description.citedreference | *NASA, 1995, NASA SYST ENG HDB, P83006 | - |
dc.description.citedreference | DEY PK, 1994, INT J PROJ MANAG, V12, P23 | - |
dc.description.citedreference | SIMISTER SJ, 1994, INT J PROJ MGMT, V12, P5 | - |
dc.description.citedreference | WILLIAMS TM, 1993, INT J PROJECT MANAGE, V11, P5 | - |
dc.description.citedreference | SPIRTES P, 1993, CAUSATION PREDICTION, P83006 | - |
dc.description.citedreference | MUSTAFA MA, 1991, IEEE T ENG MANAGE, V38, P46, DOI 10.1109/17.65759 | - |
dc.description.citedreference | BOEHM BW, 1991, IEEE SOFTWARE, V8, P32, DOI 10.1109/52.62930 | - |
dc.description.tc | 11 | - |
dc.identifier.wosid | 000263817100017 | - |
- Appears in Collections:
- Files in This Item:
- There are no files associated with this item.
Item View & Download Count
Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.