Publications
Detailed Information
Productivity management methodology using productivity achievement ratio
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Kim, Tae Wan | - |
dc.contributor.author | Lee, Hyun-soo | - |
dc.contributor.author | Park, Moonseo | - |
dc.contributor.author | Yu, Jung-Ho | - |
dc.date.accessioned | 2013-01-23T00:35:12Z | - |
dc.date.available | 2013-01-23T00:35:12Z | - |
dc.date.issued | 2011-01 | - |
dc.identifier.citation | KSCE JOURNAL OF CIVIL ENGINEERING, Vol.15, No.1, pp.23-31 | ko_KR |
dc.identifier.issn | 1226-7988 | - |
dc.identifier.uri | https://hdl.handle.net/10371/80999 | - |
dc.description.abstract | Although construction productivity has received a great deal of attention from construction practitioners and researchers, few research efforts have specifically evaluated productivity in the context of the productivity management cycle. Consequently, there is still a lack of useful indicators for determining which items should be prioritized and improved upon in order to yield the highest benefits from productivity management. In an effort to address this issue, this study proposes the Productivity Achievement Ratio (PAR), which is a productivity evaluation indicator that will assist in the selection of the most appropriate management items for construction productivity enhancement. Using a multiple linear regression analysis, the process for calculating the PAR is developed, and the applicability of the proposed indicator is verified through a case study of steel erection work. The results of this study indicate that the PAR can aid construction practitioners in achieving more balanced and effective productivity management, even when management resources are limited. | ko_KR |
dc.language.iso | en | ko_KR |
dc.publisher | Springer | ko_KR |
dc.subject | productivity | ko_KR |
dc.subject | reduction factor | ko_KR |
dc.subject | productivity achievement ratio | ko_KR |
dc.subject | regression analysis | ko_KR |
dc.subject | productivity management | ko_KR |
dc.title | Productivity management methodology using productivity achievement ratio | ko_KR |
dc.type | Article | ko_KR |
dc.contributor.AlternativeAuthor | 김태완 | - |
dc.contributor.AlternativeAuthor | 이현수 | - |
dc.contributor.AlternativeAuthor | 박문서 | - |
dc.contributor.AlternativeAuthor | 유정호 | - |
dc.identifier.doi | 10.1007/s12205-011-0983-5 | - |
dc.citation.journaltitle | KSCE JOURNAL OF CIVIL ENGINEERING | - |
dc.description.tc | 0 | - |
- Appears in Collections:
- Files in This Item:
- There are no files associated with this item.
Item View & Download Count
Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.