Browse

Economic-statistical Design of 2-of-2 and 2-of-3 Runs Rule Scheme

Cited 10 time in Web of Science Cited 14 time in Scopus
Authors
Kim, Young-Bok; Hong, Jung-Sik; Lie, Chang-Hoon
Issue Date
2009-03-01
Publisher
JOHN WILEY & SONS LTD
Citation
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL; Vol.25 2; 215-228
Keywords
economic-statistical designMarkov chain approachaverage run lengthruns ruleaverage time to signal
Abstract
In this paper, we investigate the economic-statistical design method for the 2-of-2 runs rule and the 2-of-3 runs rule. The Markov chain approach is used to obtain the average run length and the process cycle time. In addition, a simplified algorithm is presented to search the optimal setting of the design parameters. A numerical example and sensitivity analysis are also provided to compare the performances of the runs rules. The results show that the use of runs rule scheme can reduce operating cost comparing with the Shewhart control chart while maintaining a good statistical performance. Copyright (C) 2008 John Wiley & Sons, Ltd.
ISSN
0748-8017
Language
English
URI
https://hdl.handle.net/10371/75359
DOI
https://doi.org/10.1002/qre.963
Files in This Item:
There are no files associated with this item.
Appears in Collections:
College of Engineering/Engineering Practice School (공과대학/대학원)Dept. of Industrial Engineering (산업공학과)Journal Papers (저널논문_산업공학과)
  • mendeley

Items in S-Space are protected by copyright, with all rights reserved, unless otherwise indicated.

Browse